Recent Comments

    Archives

    68,000 gallons of stormwater hit Fenholloway after pump failures

    Posted on November 25, 2026

    Georgia-Pacific (GP) estimates about 68,000 gallons of untreated stormwater overflowed from its Foley mill site into the Fenholloway River Saturday, Nov. 21, after pumps at a lift station failed during a heavy rain.

    Subscribe to our e-Edition and read the rest of the story. Already a subscriber? Click here to sign in.