An early concept drawing of what Hodges Park may look like once the long-awaited reconstruction project is complete shows a raised boardwalk leading to a small Gulf-side pavilion on the park’s west side, which could potentially also be home to a series of dunes thanks to reclaimed materials from the future dredging of the Keaton Beach channel. The U.S. Army Corps of Engineers, which is overseeing the dredging project, has a mandate to utilize a certain percentage of dredged material for beach re-nourishment. For more conceptual drawings, see page 8.
The Taylor County Commission got its first look at early conceptual drawings for Keaton Beach’s Hodges Park and backed a plan for portable restrooms that can be moved out before a storm, an option estimated at about $500,000, roughly half the cost of an elevated building.
Subscribe to our e-Edition and read the rest of the story. Already a subscriber? Click here to sign in.
Recent Comments