fbpx

Recent Comments

    Archives

    Traffic shifts to temporary bridge

    Posted on August 1, 2014

    2014-08-01-US-27-Fenholloway-temp-bridge-open

    Traffic shifted to a temporary bridge on U.S. 27 over the Fenholloway River east of Perry Tuesday, July 29, where it will continue for the next several months while the existing bridge is removed and a new bridge constructed in its place. The temporary metal bridge built to the south of the existing bridge will allow U.S. 27 to remain open to traffic during the construction phase. The speed limit is reduced to 45 mph.

    Subscribe to our e-Edition and read the rest of the story. Already a subscriber? Click here to sign in.